General Documentation
General Documentation
Quick Start
Install the app
- Subsidiary user (office): immediate access from a computer connected to the Internet
- Field users (inspectors): installation of the application on the essential tablet.
The tablet must be connected to a wifi network to perform the complete installation.
1.
From the tablet, download the “SafeToLoad” application from Google play (Android tablet) or Apple store (Ipad tablet).
2.
Launch the application and modify the settings by clicking on the icon Specify the following settings:
- server : inspect.totalenergies.com
- port: 443
- check “Secure connection”
3.
Enter your username, password and click on « login ». All the data (vehicles, carriers, etc.) of the subsidiary will be synchronized.
Do not interrupt this step, it takes several minutes the first time.
The SafeToLoad application
A. Home screen
The home screen consists of the taskbar and the list of controls
in progress.
Create a new control
List of checks in progress (= checks not synchronized)
Document management: online help, quick guide and documents made available by the subsidiary
App settings
Synchronization of the tablet with the server
Turn off the app
or return to the identification screen
B. Control form
1. Pages
On the list of current controls, click the “+” button to create a new control.
The list of form pages is located on the left of the screen.
Complete each page of the control form, you can go back to the field(s)/questions you want by clicking on the desired page.
2. Alerts
Unfilled fields are indicated in the alerts, you can access them by clicking on:
or
Mandatory fields are indicated in red and the non-blocking fields in orange.
If one of the rules is not respected, the control cannot be validated by the inspector and the alerts allow him to go directly to the missing fields.
3. Checkpoints
Once all the previous fields have been completed, you can move on to the next page: checkpoints. There are several checkpoints to complete depending on the type of vehicle and the type of products to be loaded.
All checkpoints must be completed in order to validate the form.
allows you to write a comment to explain the defect found.
opens the help document which specifies what needs to be checked.
4. Photos
Click on the “photo” icon to add a photo to a checkpoint.
Camera
Gallery
EDM
Draw / annotate a photo
5. Conclusion
After completing all the checkpoints, you can access the page
conclusion.
Vehicle status
The status is automatically defined according to the result of each point and the “blocking/non-blocking” configuration of the control points:
- Accepted = 100% of points compliant,
- Temporarily accepted = 1 or more non-compliant “non-blocking” points,
- Refused = 1 or more non-compliant “blocking” points.
You can add a final comment to the inspection.
6. Signature
The inspector must sign in order to finalize the inspection.
Validate a SafeToLoad
Registration
The control must be saved before being submitted if the inspector wants to add comments. Just click on the validate icon at the top right.
Control is always present in the ongoing tasks of the inspector.
Validation
The control is validated directly by clicking on the cloud and selecting the line “Send control”.
- The control still appears in the tasks of the inspector. It will disappear once synchronization is complete.
- The control may be canceled by selecting the “Cancel” line.
Synchronize a report
When you have a network, you can synchronize the reports by clicking on the icon:
The control is saved on the server and triggers the allocation of an STL number.
You can access the aids and documents provided by the subsidiary on the GED
After validation of your report, a PDF report is generated and archived. It is then transmitted to the carrier and/or to the subsidiary if option. PDF reports are stored by year and month.
Follow the results
Archiving
Electronic document management (EDM) includes:
- all the PDF reports from the safe to load carried out,
- all online help files that are available on the tablet.
Login: https://docs-inspect.totalenergies.com/
Reporting
The reporting is generated automatically from the safe to load carried out. The
requests provide a summary of the results (rejection rate, number of
checks, etc.) and recurring anomalies.
Login: https://bi.arioflow.io/
The database
The database makes it possible to manage information on vehicles, carriers,
drivers, inspectors, depots as well as issue management. The subsidiary has the
possibility of :
- add control points (questions),
- translate questions into the local language,
- register a waiver to change a blocking point to non-blocking,
- modify online help files with photos illustrating the truck fleet
of the subsidiary.